Early-Warning Method of Train Running Safety of a High-Speed Railway Bridge Based on Transverse Vibration Monitoring
Making use of long-term transverse vibration monitoring data of DaShengGuan Bridge, the early-warning method of train running safety of the high-speed railway bridge is established by adopting principal component analysis (PCA) method. Firstly, the root mean square (RMS) of the transverse accelerati...
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Shock and Vibration |
Online Access: | http://dx.doi.org/10.1155/2015/518689 |