Non-Iterative estimation of the AC overhead line state by relinearization method

Information about the current mode of the electric power system (EPS) is received by the dispatch control centers in the form of telemetry and tele-signals by the SCADA complexes, and from phasor measurement units (PMU) devices. Tele-measurements include information about the mode parameters, and th...

Full description

Bibliographic Details
Main Authors: Balametov A.B., Khalilov E.D., Salimova A.K., Isayeva T.M.
Format: Article
Language:English
Published: EDP Sciences 2020-01-01
Series:E3S Web of Conferences
Subjects:
pmu
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2020/76/e3sconf_rses2020_01051.pdf