Analysis Of Initial Filling (Impounding) Into The Raknamo Dam With Tank Model

The impounding of the dam is the step that will be done after construction work on the dam be finished. This study aims to determine a long time and the volume of inflow on Raknamo dam in dry water year, low water year, normal water year and wet water year with tank model. Factors that affected the...

Full description

Bibliographic Details
Main Authors: Denik S Krisnayanti, Margareth E Bolla, Wilhelmus Bunganaen, Alvine C Damayanti, Costandji Nait, Bilgardo E.D.N.R Amaral
Format: Article
Language:English
Published: Universitas Diponegoro 2020-07-01
Series:Media Komunikasi Teknik Sipil
Subjects:
Online Access:https://ejournal.undip.ac.id/index.php/mkts/article/view/26757