The importance of having an accurate multiphase flow correlations program
In the petroleum industry, a suitable and an accurate vertical/directional multiphase flow correlation is normally required by the production engineer before completion and artificial lift design analysis can be performed with a reasonable degree of accuracy. Due to the repetitive step like nature o...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Coastal & Offshore Engineering Institute, UTM, Malaysia.,
1993-06-14.
|
Subjects: | |
Online Access: | Get fulltext |