Determination of the best-fit multiphase flow correlation for high water-cut wells using prosper

Pressure drop in a vertical or deviated borehole is mainly due to hydrostatic changes and friction when the produced fluids flow to the surface. When the oil is flowing upwards, the flowing pressure along the tubing string will drop and gas starts to liberate from the oil. Thus, multiphase flow form...

Full description

Bibliographic Details
Main Authors: Ismail, I. (Author), Shern, L. T. (Author), Samsuri, A. (Author), Issham, M. S. (Author), Hua Sid, L. (Author), Husein Yusof, N. (Author), Boyou, N. V. (Author), Zakaria, Z. (Author)
Format: Article
Language:English
Published: Penerbit UTM Press, 2018.
Subjects:
Online Access:Get fulltext