Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...
Main Author: | |
---|---|
Format: | Thesis |
Published: |
2016.
|
Subjects: | |
Online Access: | Get fulltext |