Soft ground improvement by prefabricated vertical drain (pvd)

Soft soil improvement in the project requires the consideration of the preloading programme. This method long track record of success and may be a unexpected time delay. Then one of the solutions is to use surcharge that fill must extend horizontally at certain depth beyond the perimeter of the plan...

Full description

Bibliographic Details
Main Author: Khalid, Nor Aisah (Author)
Format: Thesis
Published: 2018.
Subjects:
Online Access:Get fulltext