Risk based analysis for detention pond overflow at Iskandar Malaysia (Nusajaya), Johor

Overflow risk of detention pond is defined as the probability of having a rainfall event that produces a runoff volume more than the available storage capacity of detention pond. Overflow risk analysis depends on the waiting period (elapse time) and draining time. This study dealt with risk analysis...

Full description

Bibliographic Details
Main Author: Suif, Zuliziana (Author)
Format: Thesis
Published: 2008-06.
Subjects:
Online Access:Get fulltext