Optimization of industrial shop scheduling using simulation and fuzzy logic
The percentage of shop fabrication, including pipe spool fabrication, has been increasing on industrial construction projects during the past years. Industrial fabrication has a great impact on construction projects due to the fact that the productivity is higher in a controlled environment than in...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | en |
Published: |
2010
|
Subjects: | |
Online Access: | http://hdl.handle.net/10048/962 |