On-time delivery improvement at a semiconductor equipment manufacturing facility : developing robust work plan to improve resources utilization and shorten production cycle time/

Thesis: M. Eng., Massachusetts Institute of Technology, Department of Mechanical Engineering, 2017. === This electronic version was submitted by the student author. The certified thesis is available in the Institute Archives and Special Collections. === Cataloged from student-submitted PDF version...

Full description

Bibliographic Details
Main Author: Xu, Zongying, M. Eng. Massachusetts Institute of Technology
Other Authors: Stanley B. Gershwin.
Format: Others
Language:English
Published: Massachusetts Institute of Technology 2018
Subjects:
Online Access:http://hdl.handle.net/1721.1/113729