multi-kanban model for disassembly

In this paper we demonstrate how kanbans can be used in a disassembly line setting. Disassembly line is quite different from assembly line in terms of material movement, demand arrival and inventory level fluctuation. We discuss these differences and introduce the concept of a multi-kanban mechanism...

Full description

Bibliographic Details
Published:
Online Access:http://hdl.handle.net/2047/d10013817