The Planning and Control of WIP Level for Semiconductor Fabrication Factories

碩士 === 國立交通大學 === 工業工程研究所 === 84 === The general problems that the wafer fabrication encounters include thetoo long lead time and too high Work-in-Process(WIP) level. These problemsremark the importance of deciding reasonable WIP level and selecting prope...

Full description

Bibliographic Details
Main Authors: Shy, Yng-Jyh, 施盈志
Other Authors: Chung Shu-Hsing
Format: Others
Language:zh-TW
Published: 1996
Online Access:http://ndltd.ncl.edu.tw/handle/40679975815070295509