Characteristic Analysis of the Starting of Mingtan Pumped Storage Motor Units
碩士 === 國立臺灣科技大學 === 電機工程研究所 === 84 === Mingtan Pumped Storage Power Plant has two methods to start pumping motors at night. One is the traditional back-to-back method using the first machine and the sixth machine to start the others, the ot...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1996
|
Online Access: | http://ndltd.ncl.edu.tw/handle/58671157057544931801 |