The Design of Due-Date Assignment Model for Job Shop

博士 === 國立交通大學 === 工業工程與管理學系 === 85 === In the past, many production scheduling methods were developed to achieve high due-date and short manufacturing lead times performance. Although having attained valuable insight into due- date assignment problems inv...

Full description

Bibliographic Details
Main Authors: Tsai, Chih-Hung, 蔡志弘
Other Authors: Rong-Kwei Li
Format: Others
Language:zh-TW
Published: 1997
Online Access:http://ndltd.ncl.edu.tw/handle/36058349104743268703