A Study On The Flowshop Scheduling With Bicriteria Problems
博士 === 國立交通大學 === 工業工程與管理學系 === 85 === To increase a flowshop performance, to lower both throughput time and work inprocess (WIP) as much as possible is necessary. In general, the scheduling criterion on makespan minimization can effectively shorten...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
1997
|
Online Access: | http://ndltd.ncl.edu.tw/handle/41530117303742946208 |