Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication

碩士 === 國立交通大學 === 工業工程與管理系 === 87 === Due-date performance is one of the most important production performance indexes in wafer fabrication industry. This study try to develop a new method of shop flow scheduling for improves missed due-date performance. The traditional methods were addressed on cyc...

Full description

Bibliographic Details
Main Authors: Shang-Nan Huang, 黃商男
Other Authors: Rong-Kwei Li
Format: Others
Language:zh-TW
Published: 1999
Online Access:http://ndltd.ncl.edu.tw/handle/94250628717060799128
id ndltd-TW-087NCTU0031023
record_format oai_dc
spelling ndltd-TW-087NCTU00310232016-07-11T04:13:34Z http://ndltd.ncl.edu.tw/handle/94250628717060799128 Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication 應用TOC整體安全保護時間概念於晶圓廠之交期控制 Shang-Nan Huang 黃商男 碩士 國立交通大學 工業工程與管理系 87 Due-date performance is one of the most important production performance indexes in wafer fabrication industry. This study try to develop a new method of shop flow scheduling for improves missed due-date performance. The traditional methods were addressed on cycle time estimation. Most of those papers use the estimated cycle time to forecast the completion time of the product, and then utilized the part’s slack time to schedule the lot’s priority. Unfortunately, few of those methods used in shop flow successfully. The concept of TOC aggregated time buffer was developed by A. Y. Goldratt in project management. This concept use the aggregated time buffer to protect the whole project’s due date instead of that only consider individual tasks. Therefore, this study aims to develop a new shop floor scheduling method base on the concept of TOC aggregated time buffer. This method is expected to reduce the mean tardiness and tardiness job’s. A simulation model with real world data is also established to examining the performance of the proposed method. The simulation result shows a better performance was obtained for rate of due date commitment, average tardiness, variance of average tardiness and average lateness when the shop floor control rule of the TOC’s aggregated time buffer is applied for different dispatching rules. Rong-Kwei Li Sheng-Hung Chang 李榮貴 張盛鴻 1999 學位論文 ; thesis 50 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立交通大學 === 工業工程與管理系 === 87 === Due-date performance is one of the most important production performance indexes in wafer fabrication industry. This study try to develop a new method of shop flow scheduling for improves missed due-date performance. The traditional methods were addressed on cycle time estimation. Most of those papers use the estimated cycle time to forecast the completion time of the product, and then utilized the part’s slack time to schedule the lot’s priority. Unfortunately, few of those methods used in shop flow successfully. The concept of TOC aggregated time buffer was developed by A. Y. Goldratt in project management. This concept use the aggregated time buffer to protect the whole project’s due date instead of that only consider individual tasks. Therefore, this study aims to develop a new shop floor scheduling method base on the concept of TOC aggregated time buffer. This method is expected to reduce the mean tardiness and tardiness job’s. A simulation model with real world data is also established to examining the performance of the proposed method. The simulation result shows a better performance was obtained for rate of due date commitment, average tardiness, variance of average tardiness and average lateness when the shop floor control rule of the TOC’s aggregated time buffer is applied for different dispatching rules.
author2 Rong-Kwei Li
author_facet Rong-Kwei Li
Shang-Nan Huang
黃商男
author Shang-Nan Huang
黃商男
spellingShingle Shang-Nan Huang
黃商男
Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication
author_sort Shang-Nan Huang
title Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication
title_short Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication
title_full Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication
title_fullStr Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication
title_full_unstemmed Application of the TOC’s Aggregated Buffer to the Due Date Control in the Semiconductor Wafer Fabrication
title_sort application of the toc’s aggregated buffer to the due date control in the semiconductor wafer fabrication
publishDate 1999
url http://ndltd.ncl.edu.tw/handle/94250628717060799128
work_keys_str_mv AT shangnanhuang applicationofthetocsaggregatedbuffertotheduedatecontrolinthesemiconductorwaferfabrication
AT huángshāngnán applicationofthetocsaggregatedbuffertotheduedatecontrolinthesemiconductorwaferfabrication
AT shangnanhuang yīngyòngtoczhěngtǐānquánbǎohùshíjiāngàiniànyújīngyuánchǎngzhījiāoqīkòngzhì
AT huángshāngnán yīngyòngtoczhěngtǐānquánbǎohùshíjiāngàiniànyújīngyuánchǎngzhījiāoqīkòngzhì
_version_ 1718343251390365696