A Study On The Base of Construction Progress Evaluation Using Banana Curves
碩士 === 國立中央大學 === 營建管理研究所 === 91 === Abstract The construction progress of a project is very often controlled by the S-curve indicating the relationship between the projects expenses vs. the time elapsed. If the actual progress curve falls below the forecasted curve, the progress is behind the sch...