Engineer Resource Allocation for Construction Project Using ANP Method

碩士 === 國立臺灣科技大學 === 營建工程系 === 91 === This study focuses on developing an Engineer Resources Allocation Model for the building project of contractor. Through the Factors Analysis and Analytic Network Process (ANP), the Project difficulty Index (PI) and engineer Suitable Index (SI) were identified. Th...