Engineer Resource Allocation for Construction Project Using ANP Method
碩士 === 國立臺灣科技大學 === 營建工程系 === 91 === This study focuses on developing an Engineer Resources Allocation Model for the building project of contractor. Through the Factors Analysis and Analytic Network Process (ANP), the Project difficulty Index (PI) and engineer Suitable Index (SI) were identified. Th...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/81117902498971519710 |
id |
ndltd-TW-091NTUST512022 |
---|---|
record_format |
oai_dc |
spelling |
ndltd-TW-091NTUST5120222016-06-20T04:16:01Z http://ndltd.ncl.edu.tw/handle/81117902498971519710 Engineer Resource Allocation for Construction Project Using ANP Method 營造廠現場管理人力配置之研究 Chia Hao Lin 林家豪 碩士 國立臺灣科技大學 營建工程系 91 This study focuses on developing an Engineer Resources Allocation Model for the building project of contractor. Through the Factors Analysis and Analytic Network Process (ANP), the Project difficulty Index (PI) and engineer Suitable Index (SI) were identified. The Regression Analysis Proved the relation between the P.I and the management cost rate with the best fitness regression line. According to the PI, this model can help constructors to make the best allocation of project engineers under conditional management cost and expected project productivity. Min Yuan Cheng 鄭明淵 2003 學位論文 ; thesis 72 zh-TW |
collection |
NDLTD |
language |
zh-TW |
format |
Others
|
sources |
NDLTD |
description |
碩士 === 國立臺灣科技大學 === 營建工程系 === 91 === This study focuses on developing an Engineer Resources Allocation Model for the building project of contractor. Through the Factors Analysis and Analytic Network Process (ANP), the Project difficulty Index (PI) and engineer Suitable Index (SI) were identified. The Regression Analysis Proved the relation between the P.I and the management cost rate with the best fitness regression line. According to the PI, this model can help constructors to make the best allocation of project engineers under conditional management cost and expected project productivity.
|
author2 |
Min Yuan Cheng |
author_facet |
Min Yuan Cheng Chia Hao Lin 林家豪 |
author |
Chia Hao Lin 林家豪 |
spellingShingle |
Chia Hao Lin 林家豪 Engineer Resource Allocation for Construction Project Using ANP Method |
author_sort |
Chia Hao Lin |
title |
Engineer Resource Allocation for Construction Project Using ANP Method |
title_short |
Engineer Resource Allocation for Construction Project Using ANP Method |
title_full |
Engineer Resource Allocation for Construction Project Using ANP Method |
title_fullStr |
Engineer Resource Allocation for Construction Project Using ANP Method |
title_full_unstemmed |
Engineer Resource Allocation for Construction Project Using ANP Method |
title_sort |
engineer resource allocation for construction project using anp method |
publishDate |
2003 |
url |
http://ndltd.ncl.edu.tw/handle/81117902498971519710 |
work_keys_str_mv |
AT chiahaolin engineerresourceallocationforconstructionprojectusinganpmethod AT línjiāháo engineerresourceallocationforconstructionprojectusinganpmethod AT chiahaolin yíngzàochǎngxiànchǎngguǎnlǐrénlìpèizhìzhīyánjiū AT línjiāháo yíngzàochǎngxiànchǎngguǎnlǐrénlìpèizhìzhīyánjiū |
_version_ |
1718311886498299904 |