Engineer Resource Allocation for Construction Project Using ANP Method

碩士 === 國立臺灣科技大學 === 營建工程系 === 91 === This study focuses on developing an Engineer Resources Allocation Model for the building project of contractor. Through the Factors Analysis and Analytic Network Process (ANP), the Project difficulty Index (PI) and engineer Suitable Index (SI) were identified. Th...

Full description

Bibliographic Details
Main Authors: Chia Hao Lin, 林家豪
Other Authors: Min Yuan Cheng
Format: Others
Language:zh-TW
Published: 2003
Online Access:http://ndltd.ncl.edu.tw/handle/81117902498971519710
id ndltd-TW-091NTUST512022
record_format oai_dc
spelling ndltd-TW-091NTUST5120222016-06-20T04:16:01Z http://ndltd.ncl.edu.tw/handle/81117902498971519710 Engineer Resource Allocation for Construction Project Using ANP Method 營造廠現場管理人力配置之研究 Chia Hao Lin 林家豪 碩士 國立臺灣科技大學 營建工程系 91 This study focuses on developing an Engineer Resources Allocation Model for the building project of contractor. Through the Factors Analysis and Analytic Network Process (ANP), the Project difficulty Index (PI) and engineer Suitable Index (SI) were identified. The Regression Analysis Proved the relation between the P.I and the management cost rate with the best fitness regression line. According to the PI, this model can help constructors to make the best allocation of project engineers under conditional management cost and expected project productivity. Min Yuan Cheng 鄭明淵 2003 學位論文 ; thesis 72 zh-TW
collection NDLTD
language zh-TW
format Others
sources NDLTD
description 碩士 === 國立臺灣科技大學 === 營建工程系 === 91 === This study focuses on developing an Engineer Resources Allocation Model for the building project of contractor. Through the Factors Analysis and Analytic Network Process (ANP), the Project difficulty Index (PI) and engineer Suitable Index (SI) were identified. The Regression Analysis Proved the relation between the P.I and the management cost rate with the best fitness regression line. According to the PI, this model can help constructors to make the best allocation of project engineers under conditional management cost and expected project productivity.
author2 Min Yuan Cheng
author_facet Min Yuan Cheng
Chia Hao Lin
林家豪
author Chia Hao Lin
林家豪
spellingShingle Chia Hao Lin
林家豪
Engineer Resource Allocation for Construction Project Using ANP Method
author_sort Chia Hao Lin
title Engineer Resource Allocation for Construction Project Using ANP Method
title_short Engineer Resource Allocation for Construction Project Using ANP Method
title_full Engineer Resource Allocation for Construction Project Using ANP Method
title_fullStr Engineer Resource Allocation for Construction Project Using ANP Method
title_full_unstemmed Engineer Resource Allocation for Construction Project Using ANP Method
title_sort engineer resource allocation for construction project using anp method
publishDate 2003
url http://ndltd.ncl.edu.tw/handle/81117902498971519710
work_keys_str_mv AT chiahaolin engineerresourceallocationforconstructionprojectusinganpmethod
AT línjiāháo engineerresourceallocationforconstructionprojectusinganpmethod
AT chiahaolin yíngzàochǎngxiànchǎngguǎnlǐrénlìpèizhìzhīyánjiū
AT línjiāháo yíngzàochǎngxiànchǎngguǎnlǐrénlìpèizhìzhīyánjiū
_version_ 1718311886498299904