Studies of the Mechanical Behavior of Main Tunnel Due to By-pass Tunneling
碩士 === 國立臺灣科技大學 === 營建工程系 === 91 === The construction period for long tunnel can be effectively reduced if tunnel boring machine (TBM) works well. However, TBM also can be embedded or out of work if complicated geological structure is encountered, and by-pass tunneling is often used for helping TBM...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/60980391982023255072 |