An Order Due-date Control Model for the Drum-Buffer-Rope (DBR) System in the Bottleneck Reentry Environment
碩士 === 中華大學 === 科技管理研究所 === 99 === Although many manufacturing firms have found that the Drum-Buffer-Rope (DBR) methodology can result in significant improvements in productivity, this methodology is not utilized so popularly in the bottleneck reentry environments. The major reasons is that the comp...
Main Author: | |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2004
|
Online Access: | http://ndltd.ncl.edu.tw/handle/87501741935094044580 |