SIMULATION OF BRIDGE CONSTRUCTIONBY USING FPLM
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 92 === ABSTRACT Simulation techniques have been successfully used in the analysis and design of repetitive construction operations. An example of a highly repetitive construction process is the building of bridges using a Full-Span Pre-Cast and Launching Method (FPLM)....
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2003
|
Online Access: | http://ndltd.ncl.edu.tw/handle/5zj4fa |