Lot Permission Rule in Wafer Fabrication Factories with Queue-Time-Limit Considerations
碩士 === 國立清華大學 === 工業工程與工程管理學系 === 93 === As far as the wafer fabrication process is concerned, there are many factors affecting the throughput and yield rate. One of them is the “Queue-Time-Limit”. Certain process steps have the queue-time-limit, which means a lot needs to begin the following proces...
Main Authors: | Dennis Tu, 涂漢威 |
---|---|
Other Authors: | Yi Feng Hung |
Format: | Others |
Language: | zh-TW |
Published: |
2005
|
Online Access: | http://ndltd.ncl.edu.tw/handle/35929258687473423711 |
Similar Items
-
Dispatching Rules with Queue-Time-Limit Consideration for Furnace in Wafer Fabrication Factory
by: Chien-Chi Tsai, et al.
Published: (2008) -
The Dispatching Strategies for Wafer Fabrication Factories with Queue-Time-Limit Considerations
by: Tsai, Chi Tsung, et al.
Published: (1996) -
Simulation and Analysis of Dispatching Rules with Continue-Queue-Time-Limit Consideration for Metal Etch Process in Wafer Fabrication Factory
by: LEE, YEN-TSE, et al.
Published: (2011) -
Design of Dispatching Rule for Photolithography Area in Wafer Fabrication Factories with Rework Considerations
by: Yan-Han Chang, et al.
Published: (2002) -
Scrap Rules Determination for Small Lots in Wafer Fabrication
by: Chie-Wun Chiou, et al.
Published: (2002)