Clogging Effect on Groundwater Artificial Recharge in the Pingtung Plain—A case study at Wanlong Artificial lake

碩士 === 國立屏東科技大學 === 土木工程系碩士班 === 94 === The purpose of this research is to obtain an analysis of the state of changes in the infiltration velocity and groundwater mound of the recharge basin by drawing from the artificial recharge of groundwater basin. The results of the analysis will help to determ...

Full description

Bibliographic Details
Main Authors: Yang Hsin Kai, 楊信凱
Other Authors: Ting Cheh-Shyh
Format: Others
Language:zh-TW
Published: 2006
Online Access:http://ndltd.ncl.edu.tw/handle/05844548629146646609