application and development of window program for the tunnel profiling

碩士 === 中華大學 === 土木與工程資訊學系碩士班 === 95 === It mainly depends on excavation factors and the control of overbreak in tunneling, whether the measured profile is able to consist with desired profile. In order to fit design demands, for the most parts, contractors excavate a little more overbreak. By means...

Full description

Bibliographic Details
Main Authors: Yao Yi-yu, 姚逸瑜
Other Authors: Lee Yu-Lin
Format: Others
Language:zh-TW
Published: 2007
Online Access:http://ndltd.ncl.edu.tw/handle/61943407107776930491