A Study on the Dispute of the Entry Omission in the Lump-Sum Contracts
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 96 === The omitted item means that the construction project described in the drawings or specifications of the lump sum contract is omitted in the price list, causing the contractor unable to claim the project payment. However, the dispute over omitted items is not si...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/88658769324226569787 |