On multi-stage parallel-machine job shop scheduling with due windows.
碩士 === 輔仁大學 === 管理學研究所 === 96 === How to lower cost is every manufacturer’s the most important problem. Consider due window into scheduling can reduce not only the stock cost and the waste of space but also the idle time. Besides, add the quantity of machine can enlarge capacity and reach economic o...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/13681256911560614536 |