A Pilot Study for Artificial Recharge of Groundwater -A case study in Singhua Farm
碩士 === 國立屏東科技大學 === 土木工程系所 === 96 === Pingtung County is an agricultural development region. Because of the limit of hydrologic condition, the surface water resource is difficult to utilize. For a long time, groundwater became the main water resources in Pingtung plain. Lacking of management and sus...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2008
|
Online Access: | http://ndltd.ncl.edu.tw/handle/53867296371283395160 |