Cash Flow-based Scheduling Optimization Model for Construction Projects using Constraint Programming

博士 === 雲林科技大學 === 工程科技研究所博士班 === 96 === This research develops a cash flow-based scheduling optimization model for construction projects using constraint programming (CP), and provides contractors to perform financial inspection. Due to different characteristics of scheduling problems, the model fo...

Full description

Bibliographic Details
Main Authors: Chang-Jung Wang, 王滄榮
Other Authors: Shu-Shun Liu
Format: Others
Language:en_US
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/84552779573339642357