Surface Settlement-Time Relationship and Subsurface Settlement Troughs due to Shield Tunneling

碩士 === 國立交通大學 === 土木工程系所 === 97 === The first part of this paper analyzes the surface settlement-time relationship due to shield tunneling. This study collects 198 sets of field measurement data due to shield tunneling cases reported in different parts of the world from 1980 to 2008. A hyperbolic mo...

Full description

Bibliographic Details
Main Author: 吳俊德
Other Authors: 方永壽
Format: Others
Language:zh-TW
Published: 2008
Online Access:http://ndltd.ncl.edu.tw/handle/62998231889126458738