Multiple lot-sizing decisions in a two-stage production with an interrupted geometric yield and non-rigid demand

碩士 === 國立交通大學 === 工業工程與管理系所 === 97 === This research examines a new multiple lot-sizing problem, which is in the context of a two-stage production system with a due-date-based demand and the process yields are both governed by interrupted geometric (IG) distributions. We model this problem as a recu...

Full description

Bibliographic Details
Main Authors: Huang, Liang-Chuan, 黃亮銓
Other Authors: Wu, Muh-Cherng
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/90442169378129124050