Pump Down Tests and Applications of an Ultra High Vacuum System

碩士 === 國立臺灣大學 === 機械工程學研究所 === 97 === This paper studies the pump down tests and applications of an ultra high vacuum (UHV) system for electron-beam direct-write lithography. The UHV system includes a vacuum chamber, an oil vane pump, a turbo molecular pump, an ion pump, a low vacuum gauge, a high v...

Full description

Bibliographic Details
Main Authors: Tzu-Yang Chen, 陳子揚
Other Authors: 鍾添東
Format: Others
Language:zh-TW
Published: 2009
Online Access:http://ndltd.ncl.edu.tw/handle/11783977613204725302
Description
Summary:碩士 === 國立臺灣大學 === 機械工程學研究所 === 97 === This paper studies the pump down tests and applications of an ultra high vacuum (UHV) system for electron-beam direct-write lithography. The UHV system includes a vacuum chamber, an oil vane pump, a turbo molecular pump, an ion pump, a low vacuum gauge, a high vacuum gauge, and a baking heater fitted around the chamber. The prototype of the vacuum system is manufactured and performances of the prototype are tested. In order to reach different specified vacuum pressure within the shortest time, effects of the different operating process combinations are tested and analyzed. Main factors affecting the pump down characteristics include effect of ion pump, baking temperature, and baking periods. The oil vane pump and the turbo pump are always turned on during the entire pump down tests. From the test results of different operating process combinations, it shows that the vacuum system can reach the lowest vacuum pressure of 1.3E-9 Torr within 7 days, with turned on ion pump and baking of chamber for 5 days. It also shows that the chamber can reach the vacuum pressure to 9.7E-9 Torr within 1 day with turned on ion pump and one baking period. It is also concluded that both the pump down time and vacuum pressure can be greatly reduced with the adding of baking process. Finally, a field emission test of a 4x4 silicon tip array is carried out successfully inside the UHV chamber under the constant applied voltage of 1200V for test duration of 2 hours. With the field emission test species inside the chamber, the vacuum pressure reaches the order of 1.0E-7 Torr within 1 hour.