Application of Configuration Management for Construction Change Orders -- a Case Study of a Public Construction Project in Taiwan
碩士 === 中華大學 === 營建管理學系碩士班 === 98 === The design changes involve the change of scope, thus become the major source of risks for construction projects. An improper change control system usually result in schedule delays, cost overruns, and numerous disputes that cause the failure of the project. The p...