A single-machine scheduling problem to minimize the maximum tardiness with deteriorating jobs and setup times
碩士 === 逢甲大學 === 統計與精算所 === 98 === In many realistic production situations, a job processed later consumes more time than the same job when it is processed earlier. Production scheduling in such an environment is known as scheduling with deteriorating jobs. However, research on scheduling problems wi...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2010
|
Online Access: | http://ndltd.ncl.edu.tw/handle/32322655109112968846 |