Typhoon Morakot-induced Electric Pole Damage Investigation and Power Loss analysis in the Taipower Hisinying service area
碩士 === 國立嘉義大學 === 土木與水資源工程學系研究所 === 98 === Due to drought and rising temperatures caused by regional climate abnormalities, by the end of July 2009, the Tsengwen Reservoir was low. On Aug 8 Typhoon Morakot dumped a record 1,165 mm on southern Taiwan and followed that with 1,161 mm on August 9, causi...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Online Access: | http://ndltd.ncl.edu.tw/handle/87120545539852565428 |