A Study on Head-cutting Behavior due to Balin Dam Break

碩士 === 國立臺灣大學 === 土木工程學研究所 === 98 === Balin Dam break cause the sediment goes down, and the upstream channel severe erosion. This is a big concern about head-cutting behavior after Balin dam break. Balin Dam is a 38 m-height dam, which is one of the dams on the upstream reaches of Shihmen reservoir....

Full description

Bibliographic Details
Main Authors: Ying-Ting Wang, 王瀅婷
Other Authors: 李鴻源
Format: Others
Language:zh-TW
Published: 2010
Online Access:http://ndltd.ncl.edu.tw/handle/63341454323238458589