Equipment Sizing and Fast Bus Transfer Study of Combined Cycle Generation Plant in Malaysia
碩士 === 國立臺灣科技大學 === 電機工程系 === 99 === The purpose of this report is to study the electrical system calculations and to select main electrical equipment such as main transformer, auxiliary transformer, generator circuit breaker, emergency diesel generator, and DC power supply systems for a combined cy...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2011
|
Online Access: | http://ndltd.ncl.edu.tw/handle/uz3hw3 |