Equipment Sizing and Fast Bus Transfer Study of Combined Cycle Generation Plant in Malaysia

碩士 === 國立臺灣科技大學 === 電機工程系 === 99 === The purpose of this report is to study the electrical system calculations and to select main electrical equipment such as main transformer, auxiliary transformer, generator circuit breaker, emergency diesel generator, and DC power supply systems for a combined cy...

Full description

Bibliographic Details
Main Authors: Yu-Chih Huang, 黃有志
Other Authors: Chi-Jui Wu
Format: Others
Language:zh-TW
Published: 2011
Online Access:http://ndltd.ncl.edu.tw/handle/uz3hw3