The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering
碩士 === 正修科技大學 === 電機工程研究所 === 100 === The thesis proposes an effective project management (PM)to integrate the different work items in building construction. The application of PM can complete all the work item of construction in the same area within a limited duration. The work scope and its execut...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/57996558749189943030 |