The Integration Study of Work Breakdown Structure and Time Management in Project Management for Building Construction Engineering

碩士 === 正修科技大學 === 電機工程研究所 === 100 === The thesis proposes an effective project management (PM)to integrate the different work items in building construction. The application of PM can complete all the work item of construction in the same area within a limited duration. The work scope and its execut...

Full description

Bibliographic Details
Main Authors: Jhih-Hung Jhang Jian, 張簡智宏
Other Authors: Kun-Yuan Huang
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/57996558749189943030