Using Nose Tip Temperature To Evaluate System template Assembling Crew’s Performance Assembling Crew’s Performance
碩士 === 朝陽科技大學 === 營建工程系碩士班 === 100 === The productivity of labors affects the schedule of the project significantly in construction industry. How to improve the productivity of the labors has become an important issue. Currently, few studies are related to the psychological load of the labors in our...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/83538801479805022323 |