A Study of Risk Management in CATH Lab

碩士 === 逢甲大學 === 經營管理碩士在職專班 === 100 === The safety of technical room lies in risk management, especially in the lights-out cardiac catheterization lab. Generally, the lights-out cardiac catheterization lab power consumption of more than 160KVA, such a high load of the technical room, if there is no p...

Full description

Bibliographic Details
Main Authors: Pi-hsiung Chang, 張碧雄
Other Authors: Hsin-Cheng Tsen
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/8jb32n