Health Monitoring of a PSC Box Girder Viaduct Retrofittedby External Postensioning Tendons

博士 === 國立中央大學 === 土木工程研究所 === 100 === A 889 days performance evaluation of a prestressed concrete box girder viaduct retrofitted by external postensioning tendons is presented in this thesis. A PC viaduct exhibits substantial vertical deflection ever since construction completion. External postens...

Full description

Bibliographic Details
Main Authors: Chih-Shian Chen, 陳志賢
Other Authors: Chung-Yue Wang
Format: Others
Language:zh-TW
Published: 2012
Online Access:http://ndltd.ncl.edu.tw/handle/04434691254741602483