Health Monitoring of a PSC Box Girder Viaduct Retrofittedby External Postensioning Tendons
博士 === 國立中央大學 === 土木工程研究所 === 100 === A 889 days performance evaluation of a prestressed concrete box girder viaduct retrofitted by external postensioning tendons is presented in this thesis. A PC viaduct exhibits substantial vertical deflection ever since construction completion. External postens...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2012
|
Online Access: | http://ndltd.ncl.edu.tw/handle/04434691254741602483 |