Applying Novel Control Curve Search Strategy with Improved Simulated Annealing Algorithm for Solving Permutation Flow Shop Scheduling Problem
碩士 === 國立勤益科技大學 === 資訊工程系 === 102 === For Industrial manufacturing have the competitive environment of high intensity and labor costs gradually increase, industrial production scheduling problem gradually be taken seriously. Among industrial production scheduling problem, Permutation Flow Shop Sch...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2014
|
Online Access: | http://ndltd.ncl.edu.tw/handle/83636375909900251860 |