Production Control in Parallel Multi-tool Systems under Sequential Process Queue Time Constraints

碩士 === 國立臺灣大學 === 工業工程學研究所 === 102 === Production control in parallel multi-tool systems under sequential process queue time constraints is studied in this research. When WIP finished an upstream process step, the WIP should be processed at the next process step within a given amount of time. The ti...

Full description

Bibliographic Details
Main Authors: Bo-Chen Pan, 潘柏辰
Other Authors: Cheng-Hung Wu
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/77161783117777233679