Heuristics for the Unrelated Parallel Machines Scheduling Problem with the Earliness and Tardiness – A Case Study for Precision Technology Metal Tools Industry

碩士 === 東海大學 === 工業工程與經營資訊學系 === 102 === In this study, we proposed the heuristic algorithm to improve the production scheduling problem in precision technology metal tools industry. This process problem existed every Job shop production systems. If we wanted to solve it. Not only delivery time must...

Full description

Bibliographic Details
Main Authors: Chun-Wei Wang, 王駿威
Other Authors: Kun-Te Hu
Format: Others
Language:zh-TW
Published: 2014
Online Access:http://ndltd.ncl.edu.tw/handle/735qrt