The Study of Schedule Management and Tracking Using Graphic Method
碩士 === 國立臺北科技大學 === 土木與防災研究所 === 102 === Currently, there are many limitations in schedule progress control using CPM method for construction building projects. One of these problems is that it is not easy to identify and illustrate the location of updating schedule. In order to improve the problem,...