Using Non-parametric Bootstrap Method to Construct R Chart for Monitoring the Lognormal Process

碩士 === 國立交通大學 === 工業工程與管理系所 === 103 === When using X ̅-R control chart to monitor the production process, the process variation must be under control before reviewing the mean of the process. Shewhart’s R control chart is typically utilized to monitor the process variation. The control limits of She...

Full description

Bibliographic Details
Main Authors: Su,Kai-Wei, 蘇楷崴
Other Authors: Tong,Lee-Ing
Format: Others
Language:zh-TW
Published: 2015
Online Access:http://ndltd.ncl.edu.tw/handle/jfezq3