Using Non-parametric Bootstrap Method to Construct R Chart for Monitoring the Lognormal Process
碩士 === 國立交通大學 === 工業工程與管理系所 === 103 === When using X ̅-R control chart to monitor the production process, the process variation must be under control before reviewing the mean of the process. Shewhart’s R control chart is typically utilized to monitor the process variation. The control limits of She...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/jfezq3 |