The Investigation Study of Groundwater Hydrology on the Constructed Wetland- Case for Tungkang Ancient River in Pingtung Plain
碩士 === 國立屏東科技大學 === 土木工程系所 === 103 === The embankment of Tungkang current new river water way was completed in Pingtung Plain, import water source from the wetland in Tungkang ancient river i.e. the Tungkang mainstream water source was cutoff, rely on rainwater and groundwater recharge. The wetland...
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Others |
Language: | zh-TW |
Published: |
2015
|
Online Access: | http://ndltd.ncl.edu.tw/handle/nnuys2 |