Microcrack Development of Circular Tunnel Excavation under No Jointed Rock and Single Jointed Rock Mass

碩士 === 國立臺灣科技大學 === 營建工程系 === 103 === This study is using numerical analysis software PFC2D to simulate a circular tunnel with overburden depth 300 meters, considering two different circular tunnel sections are 4 meters and 8meters. Under no jointed rock and single joint cutting circular tunnel with...

Full description

Bibliographic Details
Main Authors: Liang-Wei Han, 韓良蔚
Other Authors: none
Format: Others
Language:zh-TW
Published: 2015
Online Access:http://ndltd.ncl.edu.tw/handle/11090627785915205178