The Study of Equipment Unexpected Downtime and Maintenance Problems ─ A Case Study of JI Process of a Liquid Crystal Display Company

碩士 === 朝陽科技大學 === 工業工程與管理系 === 104 === For the production equipment requiring no interruption of unexpected downtime, the production line may be slowed and may cause output quantity being reduced, production cycle time being longer, and defective or scrap products being increased if the unexpected d...

Full description

Bibliographic Details
Main Authors: Hsun-Chun Wei, 魏勳軍
Other Authors: Chun-Yuan Cheng
Format: Others
Language:zh-TW
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/nfbz7w