Parallel machine scheduling with flexible and deteriorating maintenance activities for minimizing the total completion time

碩士 === 國立中央大學 === 工業管理研究所 === 104 === In this paper we consider the problem of scheduling of n nonresumable jobs on m identical parallel machines with deteriorating and flexible maintenance activities, and the objective is to minimize total completion time. In this paper scheduling, each machine i...

Full description

Bibliographic Details
Main Authors: Kai-Hung Wang, 王凱弘
Other Authors: Gwo-Ji Sheen
Format: Others
Language:en_US
Published: 2016
Online Access:http://ndltd.ncl.edu.tw/handle/01824073717591743885